Prevention control measures for sawing 300 mm (dry)

TNO has tested control measures for sawing sand lime blocks and concrete.

SAWING 300 MM (dry) WITHOUT CONY

The hazardous substance management plan is as follows (in order of effectiveness):

Step 1: Choose quartz-Free / quartz-poor building materials.

Step 2: Choose to build PREFAB.

Step 3: Choose dust-free processes or tools.  

 

Address

Schoemakerstraat 97K
2628 VK Delft
T 088 866 30 00
F 088 866 30 10
E wegwijzer@tno.nl

RSS Feeds
Disclaimer    |    Privacy statement    |    © 2021 TNO